Standard Haul Rates
The Everyday Jobs
Volume-based pricing on a 7x14 dump trailer. One trip where other guys take three. Disposal fees always included.
Minimum Load
$99
Single items or small hauls
Quarter Trailer
$175
Small cleanout, few large items
Half Trailer
$250
Garage cleanout, yard debris
Three-Quarter
$350
Large garage or shed cleanout
Full Load
$450
Full 7x14 trailer, max volume
Property Cleanout
Quote
Multiple loads, call to discuss
ⓘ All disposal fees included. Prices may vary for heavy materials like concrete or dirt. Free quote before any work begins.
Construction & Contractor Services
Jobsite Cleanup.
Done Right.
We haul framing scraps, drywall cutoffs, roofing material, packaging, and general site debris. The Treasure Valley is building fast — we keep up with it.
Framing scraps, drywall, lumber, roofing, packaging. All standard construction debris. Disposal included.
| Job Type | Price |
|---|---|
| Small Load — Pickup Truck SizeLight debris, small site cleanups, end-of-day scraps. Fast turnaround. | $150 |
| Half Trailer LoadFraming scraps, drywall cutoffs, roofing underlayment, packaging from one phase of work. | $275 |
| Full Trailer LoadFull 7x14 dump trailer. One pull, maximum volume. Most efficient option per cubic yard. | $475 |
| Weekly Jobsite Contract RecurringPer scheduled pull. Locked-in rate for contractors who need regular debris removal. Priority scheduling. | $400 / pull |
| Concrete / Heavy Material Weight-BasedConcrete, brick, dirt, gravel. Priced by weight at Ada County Landfill. On-site estimate required. | $350 / ton |
| Multi-Home Subdivision ContractProduction builders doing 5+ homes. Volume pricing available. Call to discuss a standing agreement. | Call for Quote |
Batteries can't go in the regular landfill. We transport to an approved Ada County recycling facility.
| Item | Price |
|---|---|
| AA / AAA / C / D Household Batteries HazardousPer bag (up to 2 lbs). Must be bagged separately. No leaking batteries accepted. | $15 / bag |
| 9V / Lithium Coin Batteries HazardousPer bag (up to 1 lb). Lithium batteries must be individually taped at terminals. | $20 / bag |
| Laptop / Power Tool Lithium-Ion Pack HazardousPer unit. Damaged or swollen packs add $15 surcharge due to handling risk. | $25 / unit |
| Car / Truck Lead-Acid Battery HazardousTransported to an auto parts recycler. Core credit often passed back to you. | $30 / unit |
| Golf Cart / Marine / RV Deep-Cycle Battery HazardousHeavy lift fee may apply. No cracked or leaking cases accepted. | $45 / unit |
| EV / Hybrid Battery Pack HazardousRequires specialized handling. Call before booking. | Call for Quote |
Liquid paint is hazardous waste. Dry latex in small quantities can go to the regular landfill. We handle both.
| Item | Price |
|---|---|
| Latex / Water-Based Paint — Fully DriedPer can (up to 1 gallon). Dried latex can go to the regular landfill. We verify dryness on-site. | $10 / can |
| Latex / Water-Based Paint — Liquid HazardousPer can. Transported to Ada County HHW facility. Disposal fee included. | $20 / can |
| Oil-Based Paint / Stain / Varnish HazardousPer can. Flammable and regulated. Ada County HHW facility drop-off required. | $25 / can |
| Spray Paint / Aerosol Cans HazardousPer can. Partially full costs more due to pressurized handling requirements. | $8 / can |
| Bulk Paint Haul — Estate or Property Cleanout10+ cans mixed types. Flat rate covers transport and all disposal fees. | $175 flat |
| Paint Thinner / Solvents / Stripper HazardousPer container. Includes lacquer thinner, acetone, mineral spirits. | $30 / container |
Propane tanks are never crushed or landfilled. We transport to a certified exchange or disposal facility.
| Item | Price |
|---|---|
| 1 lb Disposable Camp Cylinder PressurizedFully used empties can be recycled. Partial or full cans require special handling. | $10 / unit |
| 14.1 oz Cylinder — Empty PressurizedValve must be open to confirm empty. We verify on-site. | $15 / unit |
| 20 lb BBQ Tank — Empty PressurizedStandard grill tank. Transported to exchange or recertification facility. | $20 / unit |
| 20 lb BBQ Tank — Partially Full PressurizedSurcharge for residual propane. We safely vent or exchange. | $45 / unit |
| 100 lb Tank — Empty PressurizedHeavy lift applies. Must confirm empty prior to pickup. | $65 / unit |
| 100 lb Tank — Partial / Full Permit RequiredRequires coordination with a licensed propane handler. | Call for Quote |
| 250 gal+ Residential Tank Permit RequiredRemoval requires a licensed propane company. We assist with logistics and site cleanup. | Call for Quote |
We knock it down and haul it away. Haul-away is always included in demo pricing.
| Item | Price |
|---|---|
| Drywall Demo — Per Room Labor IncludedStandard bedroom or bathroom. Includes demo and haul-away. Does not include insulation or mold remediation. | $250 – $450 |
| Wood Deck Demo — Small (under 200 sq ft) Labor IncludedTear-down, nail removal, and full haul-away. Concrete footings quoted separately. | $400 – $700 |
| Wood Deck Demo — Large (200+ sq ft) Labor IncludedOn-site estimate required for multilevel or complex decks. | On-Site Quote |
| Shed Demo — Small (up to 10x12) Labor IncludedWood or metal shed. Full tear-down and haul-away. Concrete slab quoted separately. | $350 – $600 |
| Shed Demo — Large (12x16+) Labor IncludedOn-site estimate required for larger structures or those with electrical. | On-Site Quote |
| Fence Removal — Wood / Chain-Link Labor IncludedPer linear foot. Post pulling and haul-away included. Concrete footings add $5 per post. | $8 – $15 / ft |
| Concrete Removal — Slabs, Steps, Walkways Labor IncludedBreakup and haul-away. On-site estimate recommended for anything over 50 sq ft. | $300 – $600 / ton |
| Hot Tub / Spa Demo Labor IncludedCut apart in place, hauled out in sections. Electrical disconnection not included. | $400 – $750 |
| Interior Fixture Demo (cabinets, vanities, tile) Labor IncludedDemo labor plus haul-away. Send photos for a fast estimate. | Photo Quote |
Common Add-Ons & Surcharges
No Hidden Fees.
Ever.
These are disclosed upfront before any job starts. If any of these apply, you'll know the total before we lift a single item.
Heavy Material Surcharge
+$50 – $150
Concrete, dirt, gravel, and rock are priced by weight at the landfill. Added to any haul containing heavy materials.
Difficult Access Fee
+$50 – $100
Tight alleyways, steep grades, stairs, or extra carry distance from the load point to the trailer.
Second Trip / Overflow
+$100 – $200
When the job fills the trailer and there's still material. Quoted before the second trip is made.
Same-Day Emergency
+$75
For jobs booked same-day when we need to reroute. Subject to availability.
Asbestos / Lead Paint
3rd Party
We don't handle these. We'll refer you to a licensed remediation company before proceeding with demo.
Permit Coordination
$50 flat
We help identify if your demo requires a City of Boise permit and walk you through the application.
Not Sure What It'll Cost?
Text a photo to (208) 789-1218. Get a number back within the hour.